Posts Tagged ‘new year’s’

h1

2011 House Resolutions

February 15, 2011

A little late, but hey. Setting the bar a bit lower on these this year given the total lack of progress on the 2010 list…so this one is short ‘n’ sweet.

1. FINISH THE KITCHEN.
This will actually get done, for no better reason than that is has to or we will go nuts! Still to do as of February 2011: painting, range hood vent, shelves, breakfast table and benches, shoe bench, backsplash tiles, butcher block counter, and rehanging the doors. Really not so bad considering where we started!

2. MEDICINE CABINET & BATHROOM PAINT.
Leftover from 2010.
We will install the medicine cabinet and paint the bathroom. No, really.

(I’m not getting too overly optimistic on the “To Do” list, though, so I’ll leave re-plastering the bathroom ceiling, which is currently threatening to come tumbling down, for 2012 or until it actually falls, whichever comes first.)

3. GARAGE SHELVES AND BIKE RACKS.
Leftover from 2010. Yeah. We will also do this in 2011, I swear!

4. CHICKENS FOR THE ‘HOOD.
Leftover from 2010. We’ll keep trying to get this together! Ever hopeful.

5. FRENCH DRAINS IN OUR FRONT YARD.
Because we need something new to do. The previous owner of our house did a lot of drainage work before selling it, but we still have one little section of the basement that gets water in heavy downpours. Unfortunately, this is also where we put the new furnace (there were good reasons for moving it and also some miscommunication on exactly where the designated spot would be, but it is what it is). So now we really need to fix the drainage. D. has been running test pumps this winter to try to pinpoint where we need to dig to get at the major problem sources, and I think he’s finally found it, or at least found a magic spot that seems to help a lot. So this spring, we need to get digging and route that water back down the hill and out of the basement. If we really get on a roll, this might expand to include tearing up the path in the backyard, digging french drains there too, and putting the path back. But really? That’s more likely to be 2013 or so…

6. ORGANIZE THE OFFICE (AKA THE SPARE BEDROOM)
We got really lazy about this one, and never got shelves for the second bedroom, so for the last few years everything’s been all over the floor in boxes. Which is kind of ridiculous given that we’re coming up on four years in this house in 2011! So sometime this year, we (by which I mostly mean D., since he uses this room as his office) will actually get some shelves and put some stuff on them.

…and that should keep us busy for most of the year, at least at the rate we’ve been going for the last year or so!

Advertisements
h1

Out with the old: Final 2009 house resolutions check-in

December 30, 2009

To wrap up 2009, here’s the status of this year’s resolutions. Look for the 2010 list next week!

Here’s the original list: My New Year’s House Resolutions

…and here’s where we are in the waning days of 2009:

1. BETTER WINDOW INSULATION.
Mostly done. In the end, I ordered 1 3/8″ spring bronze weatherstripping  from Kilian’s Hardware, since the stuff I got from our local Ace was too narrow. They shipped promptly and have everything under the sun on the old weatherstripping front. With instructions from Working Windows, a phenomenal guide, I’ll hopefully finish up the last of the weatherstripping soon. Pictures coming once I remember to take some. (I’m doing a modified version of it without removing the sashes—not the recommended way, but so far it seems to be working decently, and significantly reduces the likelihood that I’ll screw it up and need to call in the pros. But it also means I would be much happier with a staple gun, which the Tool Library has—except that they’re closed till after the new year with all the budget cuts…augh.) And the bedroom window issues will be resolved by early 2010—yay!

2. DROUGHT-TOLERANT LANDSCAPING.
Mostly done. We successfully killed the grass, but then went to war with the oxalis. This isn’t done yet, but it’s mostly because I’ve been lazy and preoccupied with other things. I think I can safely say it’s a weekend (and a few hundred dollars’ worth of DG, stones, mulch, and plants) away from being complete.

3. PRODUCTIVE VEGETABLE BED.
Done! The garden did quite respectably this year, though it’s definitely still a work in progress. I continue to be in awe of the huge yields from some friends’ gardens, so I’ll keep at it. I put cover crops in this winter, so hopefully that will help, too.

Lettuce bed

4. NEW POWER STRIPS.
Done! Pictures are not exciting here, so you don’t get any…

5. CLOTHES LINE.
Done! But no photos till we get the landscaping done, since right now the yard looks pretty icky.

6. NO MORE LEAKY TUB.
Umm, done? We got stuck on this one, so I’m not even sure it counts as done. Technically, it doesn’t leak anymore. But in the process of trying to fix it, we broke it more, had to hire a plumber to fix that, and then discovered that it had been fixed incorrectly. Fixing the new problem turned out to be an even bigger project that will entail retiling the bathroom, so for now we’re living with a slightly imperfect faucet setup. Moral of the story: hire people who know what they’re doing, especially when you don’t!

7. RAIN BARREL.
Mostly done. After trekking all over town looking for the specific parts D. had in mind for this, we finally found them at Grainger in West Berkeley. He’s off this week, so with luck this might be finished before the new year. Pictures and maybe an instructable to follow once it’s all installed and caulked in, but Gene over at DIY Insanity has some great photos up of the barrels pre-holes on the new platform he helped us build last month (and by “helped” I mean walked us through pretty much step-by-step—thanks again!!)

Gene's photo of the barrels on their brand new platform!

Gene's photo of the barrels on their brand new platform!

8. RETAINING WALL & FENCE.
Done!

Another view

9. DISHWASHER.
Not done. But…WE ARE GETTING OUR FIRST BIDS ON THE STRUCTURAL WORK IN THE KITCHEN! This is my most exciting news. It won’t make the 2009 list, but it’s within reach at long last. (And it better make the 2010 list…)

In fact, it might be fortuitous that it took so long—if Obama’s Cash for Caulkers program really gets rolling, we’re all set to buy both our dishwasher and new refrigerator under it! And we may apply to be guinea pigs in Oakland’s version of CaliforniaFIRST, which spreads the cost of energy efficiency improvements over a number of years by rolling the cost into property taxes. When we take out our furnace chimney, we’ll have to re-vent our furnace and water heater, and it might be the ideal time to replace both. (They still have a few years left in them, but both are aging, neither is high-efficiency, and D. is itching for a solar water heater.)

So we’re 8 for 9 for 2009—not too bad, actually!